Free CFA Level 1 tool

NPV & IRR calculator

Enter the discount rate and the cash flows, starting with the time-0 outlay as a negative number. NPV and IRR update as you type, with the accept or reject rule beside them.

All CFA Level 1 calculators

NPV & IRR calculator

NPV = Σ CFt/(1 + r)^t; IRR is the r that makes NPV = 0

Separate with commas. CF0 is usually negative.

NPV

243.43

Accept: NPV is not negative

IRR

23.375%

The rate where NPV = 0

In the exam you use your own calculator

Only the BA II Plus and the HP 12C are allowed. Check your answer here, then redo it with the BA II Plus keystrokes.

Free next step

Start revising today with one full module, free

The Rates and Returns cheat sheet is open in full in the study dashboard, with its mind map, flash cards and a quiz. No sign-up needed to start.

The notes PDF needs a free account (no card). Used alongside your curriculum or prep provider.

One-page cheat sheet for each subject

NPV & IRR calculator: questions candidates ask

When do NPV and IRR give different answers?
For a single project they agree: NPV is positive exactly when the IRR is above the discount rate. For two mutually exclusive projects of different size or timing they can rank them differently. CFA Level 1 says to follow NPV in that case, because it measures the value added in money and assumes cash flows are reinvested at the cost of capital.
Why can a project have no IRR or more than one?
IRR is the rate that makes NPV zero, so it needs the cash flows to change sign. A project with only inflows or only outflows has no IRR. A project whose cash flows change sign more than once, for example a large clean-up cost at the end, can have two or more rates that make NPV zero, and then IRR is not a reliable guide.

Free: CFA Level 1 Top 27 Formulas PDF

The formulas that come up most, across every topic, on one printable A4 page — with notes on when to use each.

Free account · no card · then print or save it

Get the free PDF (free account)